GTE post : In the Valle Morado block, a re-entry and sidetrack of the
VM.x-1001 well is scheduled for Q3 2010, for an estimated cost of US$15.1 million. The sidetrack well is being drilled to test the resource potential discovered by the VM.x-1001 well. Not sure what this means, thoughts?? Is this the 7million a day well now? Sounds more like a new well in a old hole,...