More site info...
Revit Architecture - General | Forum profile
|
|
Forum profile page for Revit Architecture - General on http://augi.com.
This report page is the aggregated overview from a single forum: Revit Architecture - General, located on the Message Board at http://augi.com.
This forum profile page summarizes the general forum statistics such as: Users Activity, Forum Activity, and Top Authors, which are reported in either a table or graph below for a given reporting time period.
Additional forum profile information for "Revit Architecture - General" on the Message Board at http://augi.com is also shown in the following ways:
1) Latest Active Threads
2) Hot Threads for Last Week
Warning: These statistics are generated using 'best efforts' and can experience delays and reporting errors at times. Please note that such statistics do not constitute a forum's popularity and/or exact posting volumes at any given reporting period.
|
|
|
|
|
Posting activity on Revit Architecture - General:
|
|
Week
|
Month
|
3 Months
|
|
Threads:
|
71
|
428
|
1,588
|
|
Post:
|
261
|
1,201
|
4,840
|
|
|
Revit Architecture - General Posting activity graph:
|
Top authors during last week:
user's latest post:
Reset Yes/No parameter in...
Published (2009-11-27 17:35:00)
I would simply have one condition be a color (which would print grayscale) and the other condition no color, to remain white. That should be sufficient for a yes/no condition.
user's latest post:
Finish Schedules in Revit
Published (2009-11-27 20:07:00)
Quote: Originally Posted by cliff collins Sounds like you will need to create multiple materials on the walls, which can be done several ways: 1. Split face tool, the "paint" on materials onto the split faces of the wall. 2. Use individual walls which are just the thickness of the material, and place them on top of the framed walls. 3. Create Stacked Walls, which combine several individual wall types, each with their own...
user's latest post:
Window Join at Corner
Published (2009-11-25 00:11:00)
I stand corrected...sorry, all. wow...what a pain...
user's latest post:
entourage ...
Published (2009-11-27 22:04:00)
Revit City or Google Warehouse............ cheers
user's latest post:
Reset Yes/No parameter in...
Published (2009-11-27 08:14:00)
There´s no direct way to define the cells to be left blank, but there´s another option, which will do what you want. You need to hide the current YESNOPARAMETER and instead add a new calculated field to your schedule (Calculated Value, Formula, Type: Text) Formula: if(YESNOPARAMETER, "Yes", " ") "Yes" can also be sustituted by a "X", or anything you like Have a good one.
user's latest post:
Finish Schedules in Revit
Published (2009-11-27 23:57:00)
Also, I've discovered that a second identical tile wall is not allowed to have the same "mark".
user's latest post:
How Can I Spell Check in Revit?
Published (2009-11-25 19:20:00)
I wasn't clear i guess. When I spell check, it pops with this Dialog box. And we got good amount of data. And I am pretty sure there must be some typos out there. Its' like its not even doing anything but popup with this dialog.
user's latest post:
Hardest thing you ever learned...
Published (2009-11-25 15:23:00)
Railings - yes. The other item is in the Family Editor: The fine nuances of reference planes, and instance parameters (to get, or avoid the blue handles) When type and instance parameters can be mixed in a formula( order does matter!) Nesting of shared vs non-shared families, and their effects in projects. Advanced 3D arrays in families, and the amount of nesting required.
|
|
|
|
Latest active threads on Revit Architecture - General::
Started 1 week ago (2009-11-27 14:52:00)
by drubinoff
Hi,
I've been reading up on how to create a finish schedule in Revit. I've been looking at Schedule Keys, etc., and all I've been able to do is confuse myself as to how this is to be done.
My project is a retail store, which is one room but has multiple wall finishes, floor finishes, and millwork finishes.
I looked at creating keys for a room schedule, but I've fouled this up and ...
Started 1 week, 1 day ago (2009-11-27 08:14:00)
by Munkholm
There´s no direct way to define the cells to be left blank, but there´s another option, which will do what you want.
You need to hide the current YESNOPARAMETER and instead add a new calculated field to your schedule (Calculated Value, Formula, Type: Text)
Formula: if(YESNOPARAMETER, "Yes", " ")
"Yes" can also be sustituted by a " X", or anything you like
Have a good one.
Started 1 week ago (2009-11-27 22:35:00)
by joe.zhou
http://forums.augi.com/showthread.ph...errerid=120 257
Started 3 weeks, 1 day ago (2009-11-12 17:26:00)
by kyonta.smith
Linked CAD file migration!
I am currently using Revit Architecture 2009 and I keep having problems with linked AutoCAD files. I am linking a civil site plan into my model, only to come back into the file later to find that the CAD file has ran away.
I clean up the CAD file to its minimum information. Then I import the file into Revit...
Started 1 week ago (2009-11-27 22:04:00)
by cliff collins
Revit City or Google Warehouse............
cheers
Started 1 week ago (2009-11-27 19:45:00)
by mark.98140
You msy wish to read up on the way in which walls are constructed in revit
in terms of the join order of sub wall components..this tends to be the
main reason for odd wall joins... further, you can toggle through various
wall join options as well using the modify wall jon command..
Started 1 week, 1 day ago (2009-11-26 16:26:00)
by twiceroadsfool
Quote:
Originally Posted by kyler
Hey everyone,
I don't know if anybody else has experienced this, I'm sure I'm not the only one who has. It's one thing for Revit to give you some kind of error message, but when it just closes without any type of warning, it really grinds my gears. I will be working in Revit Architectural 2010 one...
|
|
Hot threads for last week on Revit Architecture - General::
Started 1 week, 1 day ago (2009-11-26 16:26:00)
by twiceroadsfool
Quote:
Originally Posted by kyler
Hey everyone,
I don't know if anybody else has experienced this, I'm sure I'm not the only one who has. It's one thing for Revit to give you some kind of error message, but when it just closes without any type of warning, it really grinds my gears. I will be working in Revit Architectural 2010 one...
Started 1 week ago (2009-11-27 14:52:00)
by drubinoff
Hi,
I've been reading up on how to create a finish schedule in Revit. I've been looking at Schedule Keys, etc., and all I've been able to do is confuse myself as to how this is to be done.
My project is a retail store, which is one room but has multiple wall finishes, floor finishes, and millwork finishes.
I looked at creating keys for a room schedule, but I've fouled this up and ...
Started 1 week, 1 day ago (2009-11-27 08:14:00)
by Munkholm
There´s no direct way to define the cells to be left blank, but there´s another option, which will do what you want.
You need to hide the current YESNOPARAMETER and instead add a new calculated field to your schedule (Calculated Value, Formula, Type: Text)
Formula: if(YESNOPARAMETER, "Yes", " ")
"Yes" can also be sustituted by a " X", or anything you like
Have a good one.
Started 1 week, 2 days ago (2009-11-26 10:10:00)
by rudolf_weyers
Re: Walkthrough File Size
If you are working on Windows vista, you can use the windows movie maker. Just import the AVI file and then publish it to a .wmv format which is much smaller than the original AVI file.
Started 1 week, 2 days ago (2009-11-26 10:07:00)
by Elmo
Re: Solid filled regions print always black
If you want colours to come through don't use black lines because it will make everything black. Rather leave it on colour.
__________________
BIMHighway
Content management and cost estimating solution for Revit
The CWC Streaker!...
Started 1 week, 3 days ago (2009-11-24 20:11:00)
by rganter.97143
Do you meet these settings?
3 GB RAM
6 GB virtual memory setting
not a lot of windows open simultaneously
not a lot or large Revit or CAD links in the model
If you do, and if you have more than 3 GB of RAM, try enabling the 3 GB switch. This usually works for us.
Started 1 week ago (2009-11-27 15:36:00)
by cliff collins
Looking at the keynote text file, you need to tab and add F1 at the end of the line.
Syntax on the keynote text file must be entered exactly and correctly, or the
annotation in the Revit model will not work correctly.
As a good place to start, when adding a new line into the keynote text file, copy an existing line directly above it and then edit it, being careful to tab and align to ...
Started 1 week, 2 days ago (2009-11-26 00:09:00)
by Scott Davis
Make sure that nothing in the family extends too fat outside of the window in the family editor. If you have a stray ref plane or some other object that gets "cut" in plan (even if its invisible) it will make the window show up.
Started 1 week, 1 day ago (2009-11-27 00:42:00)
by joe.zhou
Material Takeoff update
has anyone experienced the the following issue?
sometimes, when you add or modified either elements or materials, the existing view of Material Takeoff won't update accordingly, i may have to recreate that view.
is this a display issue similar to 3D view recreation stuff?
thanks
Started 1 week ago (2009-11-27 22:35:00)
by joe.zhou
http://forums.augi.com/showthread.ph...errerid=120 257
|
|